| | | | | | | | | | Trane’s acquisition of LiquidStack and Submer’s latest expansion moves signal a new phase in AI data center growth, where liquid cooling and integrated thermal strategies are becoming central to deploying high-density, AI-scale infrastructure worldwide. |
|
|
| | |
| |
| | |
|
|
| | | | | | Sponsored | | Schneider Electric's Vance Peterson and Gia Wiryawan explain why power distribution and thermal management—not compute—are the bottleneck for operators when supporting NVIDIA's high density accelerators, like the B300. |
|
|
| | |
| |
| | |
|
|
| | | | | | Sponsored | | Early Bird pricing offers a $100 savings on your full conference registration for Microgrid Knowledge 2026 when you register before April 3. Join a diverse community of energy leaders exploring resilient, sustainable, and decentralized solutions powering the future. |
|
|
| | |
| |
| | |
|
|
| | | | | | As AI infrastructure spending surges worldwide, billions are flowing into new campuses, power systems, and advanced cooling technologies. But as the ecosystem expands, a key question remains: who is actually capturing the greatest share of the value being created? |
|
|
Sponsored | | Each month Data Center Frontier, in partnership with Pkaza, posts some of the hottest data center career opportunities in the market. Here’s a look at some of the latest data center jobs posted on the Data Center Frontier jobs board, powered by Pkaza Critical Facilities Recruiting |
|
|
|
| |
| | |
|
|
| | | | | | | | As sovereign AI, edge deployments, and regional capacity expand, developers are simultaneously racing to build gigawatt-scale hyperscale campuses where power is abundant, redefining how and where the next generation of AI infrastructure gets built. |
|
|
| | As AI rack densities surge, operators are moving from row-level CDUs to facility-scale liquid cooling. DCX’s new megawatt-class coolant distribution platforms enable warm-water, chillerless cooling architectures designed to support next-generation AI data centers at hyperscale. |
|
|
| | AI data center growth is driving unprecedented electricity demand, exposing U.S. grid and transmission constraints. The 2025 ACEG report highlights regional disparities in transmission planning, warning that grid upgrades are lagging behind AI-driven load growth and threatening future data center expansion... |
|
|
| | |
| |
| | |
|
|
| | | | | | Sponsored | | In a world where construction delays, equipment shortages, and supply chain disruptions are redefining project timelines, adaptive reuse has emerged as one of the most strategic paths forward for data center development. Transforming existing spaces into high-performance digital infrastructure demands... |
|
|
| | |
| |
| | |
|
|
| | | | | | Sponsored | | Join CargoSense, Data Center Frontier, DPR Construction, Schneider Electric and a data center operator to be named for a deep dive into how real-time logistics intelligence—across location, condition, chain-of-custody, and environmental risk—helps every stakeholder deliver faster, more predictably, and with fewer disputes. |
|
|
Sponsored | | In this episode of the Data Center Frontier Show podcast, DCF Editor in Chief Matt Vincent speaks with Michael Obradovitch, Vice President, Global Accounts for Data Centers at Ecolab. |
|
|
| | |
| |
| | |
|
|
| | | | | EDITOR'S PICKS by Matt Vincent |
| | |
| | Nvidia’s reported pullback from a proposed $100 billion OpenAI investment tied to the Stargate AI infrastructure buildout signals a shift toward capital discipline in the race to deliver gigawatt-scale AI data center capacity worldwide. |
|
|
| | Nomad Futurist founders Nabeel Mahmood and Phillip Koblence join Data Center Frontier to break down the real story behind this year’s PTC gathering in Hawaii: power realities, workforce urgency, community engagement, and why AI infrastructure is entering its execution phase. |
|
|
| | Robotics is moving onto the critical path of data center construction and operations. From fleet-based drilling to perception-driven inspection and digital twins, a phased roadmap points toward more standardized, robot-ready facilities built for AI-era scale. |
|
|
|
| |
| | |
|
|
| | | | Interested in reaching the Data Center Frontier audience with your own message?
Email: Tom Larranaga, (973) 460-9476 |
| |
| | |
|
|
| | |
|
| | |
|